photo of footway by Aldi, Walton

Walton Local Street Improvements: Have your say

Help shape the future of Walton-on-Thames area by submitting your views on our proposals to make streets safer, healthier and more attractive with improved facilities for walking, wheeling and riding.  

Thank you to everyone who took part in the latest round of engagement on the project. We are currently reviewing all of the feedback received and we plan to report on the engagement results in due course.  

About the project

Email

As part of Surrey's Local Street Improvements Programme, a scheme in Walton-on-Thames area is being developed.

Following two rounds of engagement which provided us with ideas and views from local stakeholders, proposals have been developed for Walton-on-Thames area to make streets safer, healthier and more attractive with appropriate vehicle speed limits and improved facilities for walking, wheeling and cycling.

We want to obtain views from local stakeholders on the proposals to help shape the plans in Walton-on-Thames. We would like to hear from people who live, work, study, travel through and spend time in the Walton-on-Thames area.

We have split the proposals into three areas as shown on the map below. The proposals are contained on individual pages for each area which can be accessed from the map below or from the ‘Have your say page’, which also contains information about the proposed 20mph speed limit area.

Please provide your views on the proposals by 14 December 2025 via the short surveys on each of the area pages.

If you are unable to use the online survey, please send your views via the email address at the bottom of this page.

Please note, funding is currently in place until the end of stage 3 design only. A bid for further funding will be necessary for detailed design and construction. It may be necessary to prioritise certain elements of the proposals in a bid for construction funding, depending on the anticipated amount of funding available.

Engagement Stage 3 - Further engagement

ces2h6zcylgldqo2r9tk.jpg

Stage 3 Engagement Report

Read our engagement stage 3 report which describes the engagement process and summarises responses received

Posted:
Read More
Photo of highway on Bridge Street near The Bear, Walton
Closed

Bridge Street and surrounding roads (Area 1)

View the updated design proposals for Bridge Street and surrounding roads

Project:Walton Local Street Improvements
Photo of Manor Road
Closed

Manor Road and surrounding roads (Area 2)

View the updated design proposals for Manor Road and surrounding roads

Project:Walton Local Street Improvements
Photo of highway Sunbury Lane and Franklyn Road
Closed

Felix Road and Franklyn Road (Area 3)

View the updated design proposals for Felix Road, Franklyn Road and surrounding roads

Project:Walton Local Street Improvements
Photo showing 20mph roundel
Closed

Area wide measures

Find out more and give your feedback on the area wide measures

Project:Walton Local Street Improvements
Photo of parking sign (generic)
Closed

Parking in Walton-on-Thames

View information on parking in the Walton-on-Thames LSI

Project:Walton Local Street Improvements
Photo near the George Inn pub in Walton

You Said, We Did

View a list of the key changes compared to the previous stage of engagement

Posted:
Read More
Photo of walton library

Events and activities

Updates on engagement events can be found here.

Posted:
Read More

Timeline

Engagement stage 1: Early engagement

23 Oct 2023 - 30 Nov 2023
The views of local stakeholders were invited to shape the plans. Events were being held at the Walton Library on 4th and 7th November 2023.

Feasibility designs developed

Nov 2023 - June 2024
Feasibility design proposals have been developed using ideas gathered from early engagement and informed by surveys undertaken by the Project Team.

Engagement stage 2: Informal engagement

23 Sept 2024 - 3 Nov 2024
We sought views on the feasibility design proposals to shape any changes and influence the development of more detailed designs.

Design review and preliminary designs developed

December 2024 - October 2025
The plans have been reviewed, changed where applicable and developed further in more detail (to preliminary design stage), incorporating feedback from the second stage of engagement.

Engagement stage 3: Further engagement

3 November 2025 - 14 December 2025
Further engagement is now taking place to gather feedback to influence the detailed designs.

Detailed designs developed

The designs will be developed in detail and finalised, taking into account feedback from the public consultation. The designs will be costed and different elements prioritised where appropriate.

Applying for construction funding

Funding is currently only in place for design. It is proposed that applications would be submitted for construction funding when suitable opportunities become available.

Meet the team

Surrey County Council
Surrey County Council

Surrey County Council is the Highway Authority for Surrey. We are responsible for maintaining roads, pavements and other public highways within Surrey and for introducing changes in line with our Local Transport Plan. We shall be using the data collected from these sites to inform our future plans for the area.

Read Surrey County Council privacy policy

Contact Team

Local Street Improvements Team