
A new era of sustainable leisure
Did you know that the new leisure centre will be super energy efficient?
Cranleigh Leisure Centre
A new era of sustainable leisure

The new Cranleigh Leisure Centre will be a leading example of a new wave of sustainable leisure. It is expected to be only the fourth leisure centre in the UK to achieve ‘Passivhaus’ certification, meaning it will be super energy efficient.
Leisure centres are traditionally energy hungry buildings, and the new leisure centre will use 60% less energy per square metre than the old building, and we’re expecting a 75% reduction in carbon emissions from the operation of the leisure centre each year.
“Did you know: a 75% reduction in carbon emissions per year is equal to 750 cars commuting 40 miles a day for a year!”
Beyond the energy savings, there are several benefits for people, including improved internal air quality and the latest microfiltration technology in the pools to help to create better swimming environments.
How we design to save energy – some examples
- the new leisure centre will be designed with high performing insulation and glazing to limit heat loss
- a heat recovery system is utilised in the shower areas - this allows for heat to remain in a “closed loop” to help lower energy demand
- the building is also designed for optimal solar gains, so it will benefit from natural heating by the sun
- and in addition, solar panels on the roof will generate renewable energy, providing 25% of the building’s electricity
- the new building will utilise air source heat pumps to heat the building. These are five times more efficient than traditional boilers
- transport is also a key part of the sustainable design, and we’ll enhance the access around the site for walkers and cyclists.
How we design to save energy – some more details
The new building will be designed with high performing insulation and glazing to limit heat loss, high levels of air tightness to limit the infiltration of cold air and that it will use sophisticated ventilation systems and heat pumps to recover heat in the air and use it for heating pool water and for space heating.
The building is designed for optimal solar gains, so it will benefit from natural heating by the sun. The energy efficient design of the building will significantly reduce its energy demand, compared to that of a conventional leisure centre.
In addition, solar panels on the roof will generate renewable energy.
“Did you know: solar panels will provide 25% of the building’s electricity and air source heat pumps will heat the building, which are 5 times more efficient than traditional boilers.”
The new leisure centre is also designed to be water efficient. The Passivhaus design will reduce evaporation losses in the pool hall, an advanced pool water filtration system will use less backwash water and waste pool water will be reused for flushing WCs. A heat recovery system will be utilised in the shower areas, allowing heat to remain in a ‘closed loop’ and helping to lower energy demand.
Good news for walkers and cyclists
Access is a key part of the sustainable design of the new leisure centre. The existing pedestrian routes around the site will be retained and enhanced, linking to the High Street to the north and Snoxhall Fields to the south. Step-free routes will be provided to all parts of the building and passenger lift access will be provided between the storeys.
The existing cycle shelter will be reused, and new cycle stands, including diversity stands for three wheeled trikes and cargo bikes, will be installed to increase the amount of cycle parking. E-bike charging points will also be provided. To the south of the site, the public footpath connects to a public bridleway, which forms part of Route 223 of the National Cycle Network and is an important recreational route for walkers and cyclists.
There is a bus stop approximately 200m from the proposed entrance to the new leisure centre, on the B2128, adjacent to Cranleigh Library. To help plan your journey to the leisure centre, bus timetables can be found on the public transport section of Surrey County Council’s website.
There will also be provision for electric vehicle (EV) charging bays, with the potential for more EV charging bays to be installed in the future.
Discover more

Car parking and The Market
Find out about the plans for car parking during and after the build, and what happens to Cranleigh Market.

You said, we did...
See how the ideas and feedback we received from the community have helped inform the final design

New leisure centre plans
Explore the exciting designs, discover all that the new leisure centre will offer, and read about the project background

Designed for Everyone
A welcoming space for all ages and abilities - thoughtfully created so everyone can move, connect, and feel their best.

Frequently asked questions
Answers to questions we have been asked about the project

Give us feedback
Let us know your thoughts on the concept designs - closing date for comments 5pm on Friday 22 March
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.


