S106 17-19 Rochester Row Public Realm
Public realm improvements outside the new development at 17-19 Rochester Row are being proposed as part of the developer's planning conditions with Westminster City Council.
Further information on the proposal can be found below, and we would be pleased to receive any comments you may have.
Have your say by 4th November 2026.
About the project
The Developer (Rochester Row Limited) of 17-19 Rochester Row is proposing highway and public realm improvements on Rochester Row, Rochester Street and Greycoat Street as part of their planning conditions (Ref: 23/05475/FULL) with Westminster City Council. These works will include improvements to both the footway and carriageway.
Westminster City Council are notifying local residents and stakeholders of these proposals and would be pleased to receive any comments you may have on this consultation.
The current proposals for the highways and public realm improvements and parking changes include the following:
Rochester Row
- New proposed kerbs
- Reinstatement of new concrete pavers
- Introduction of an additional shared-use bay to replace a redundant EV bay
- Carriageway resurfacing
- Improved tactile paving at uncontrolled crossing
- Road markings refresh
Rochester Street
- New concrete pavers to replace mastic asphalt
- New kerbs
- Carriageway improvements
- Road markings refresh
Greycoat Street
- New concrete pavers to replace mastic asphalt
- New kerbs
- Road markings refresh
Have your say
Timeline
Threshold Level Review
Stage 12 Initial Design Review
Section 6 Consultation
Stage 3 Detailed Design
Stage 5 Implementation Works
Meet the team

Westminster City Council is responsible for running this consultation, analysing its results and presenting them to stakeholders and the public.
Contact Team
In order to request hard copies of the materials or any reasonable adjustment to participate, please contact: WCC-Consultation@wsp.com. Alternatively, call Westminster City Council General Enquiries on 020 7641 6000 and they will pass your request along to the consultation team.
Timeline
Threshold Level Review
Stage 12 Initial Design Review
Section 6 Consultation
Stage 3 Detailed Design
Stage 5 Implementation Works
Team
Let's introduce you to the team
Commonplace facilitates this conversation on behalf of the team made up of the organisations listed here. The information you provide will only be used for the purposes stated in each organisation’s privacy policy.

Westminster City Council is responsible for running this consultation, analysing its results and presenting them to stakeholders and the public.