New Zealand House, 80 Haymarket Public Realm
Public realm improvements outside the new development at 80 Haymarket are being proposed as part of the developer's planning conditions with Westminster City Council.
Further information on the proposal can be found below and we would be pleased to receive any comments you may have.
About the project
The Developer (The Crown Estate) of 80 Haymarket is proposing highway and public realm improvements on Haymarket and Pall Mall, as part of their planning conditions (Ref: 19/07815/FULL) with Westminster City Council. These works will include improvements to both the footway and carriageway.
Westminster City Council are notifying local residents and stakeholders of these proposals and would be pleased to receive any comments, to this informal consultation, you may have.
The current proposals for the highways and public realm improvements and parking changes are indicated on below drawing and include the following:
Pall Mall
- Conversion of the existing vehicular crossover into footway
- Reinstatement of existing kerbs
- Reinstatement of the existing footway material
- Introduction of loading restrictions
- Road markings refresh
Haymarket
- Introduction of a new vehicular crossover
- Reinstatement of existing kerbs
- Reinstatement of the existing footway material
- Relocation of the parking bay
- Road markings refresh
Have your say

Project Background & Proposed Highway Works
Find out more about the proposed public highway and traffic management changes.

Have your say
Share your feedback
Timeline
Threshold Level Review
Stage 1 Feasibility Design Review
Stage 2 Initial Design Review
Traffic Management Order (TMO) & Section 6 Public Consultation
Stage 3 Detailed Design Review
Stage 5 Implementation Works
Contact Team
In order to request hard copies of the materials or any reasonable adjustment to participate, please contact: WCC-Consultation@wsp.com. Alternatively, call Westminster City Council General Enquiries on 020 7641 6000 and they will pass your request along to the consultation team.
Timeline
Threshold Level Review
Stage 1 Feasibility Design Review
Stage 2 Initial Design Review
Traffic Management Order (TMO) & Section 6 Public Consultation
Stage 3 Detailed Design Review
Stage 5 Implementation Works
Proposals
All other tiles

Have your say
Share your feedback
Team
Let's introduce you to the team
Commonplace facilitates this conversation on behalf of the team made up of the organisations listed here. The information you provide will only be used for the purposes stated in each organisation’s privacy policy.

Westminster City Council is responsible for running this consultation, analysing its results and presenting them to stakeholders and the public.