Winter Haven, FL
Lake Conine

Lake Conine Treatment Wetland Project

The Lake Conine Project is approximately 32 acres and the property and provides areas for natural habitat for wildlife. The first phase of the project consisted of construction of stormwater treatment and wetland cells on the site and was completed in 2022. This phase was a partnership between Polk County, Florida Department of Environmental Protection, the Southwest Florida Water Management District and the City of Winter Haven.

The second phase includes the construction of recreation elements. The Recreation Elements are designed around providing public access to the shoreline of Lake Conine and experiencing the wetlands. The recreation elements primarily consists of the following:

  1. Trail systems including paved and stabilized trails
  2. Pedestrian walkway bridges/boardwalks (as part of the trail system)
  3. Parking Lot
  4. Amenities such as a playground, restroom building, picnic areas, benches, trash cans
  5. Fishing Pier
  6. Kayak Launch
  7. Perimeter Fencing
  8. Landscaping & Trees
  9. Educational Signage

The trail system will have varying distance loops, with the overall loop just under a mile. The trail system will also connect to Motor Pool Road and the Chain of Lakes Trail in a future project.

The contractor for the project is Whitehead Construction. The project is expected to take between 9-10 months to complete. The total costs of the Recreation Elements Phase is $3,787,594. The project is being funded through the City of Winter Haven, Polk County, Community Development Block Grant Funding, a Florida Recreation Development Assistance Grant, a contribution for the playground from Duke Energy and City funds. 25% of the total costs are being funded through the various grant dollars and contributions listed above.

Manténgase informado

Reciba notificaciones sobre los próximos compromisos y las últimas noticias relacionadas con el proyecto.

"This is an improvement project on a 32-acre property by transforming it into a restored wetland site"
Andy Palmer
Parks Planning & Strategic Initiatives Manager

Fases del proyecto

Recreation Elements Phase
Late 2024

Fechas importantes

14
may 2024

Lake Conine Recreation Elements Construction Open House

Tuesday May 14, 2024 from 4:30-6:00 pm
City Staff and representatives from the design and construction team will be on hand to show latest renderings of the project, talk about construction timelines, answer questions on the design and what to expect during construction and after.
Wilfred Smith Resource Center
135 Avenue Y NE Winter Haven, 33881