W Adaline St

Resurfacing improvements will occur along W Adaline Street from the State Road 32 intersection east to S Andrews Road, improving travel conditions for nearby residents and neighborhood connections.

W Adaline Street Road Improvement Project

Project Overview

The Town of Yorktown will complete resurfacing improvements along W Adaline Street, beginning at the State Road 32 intersection and extending east to S Andrews Road.

This project will improve pavement conditions along an important residential corridor and strengthen connectivity between local neighborhoods and State Road 32.

Project Limits

Start: State Road 32 intersection (State Right of Way)
End: S Andrews Road

Work will begin at the State Right of Way (SROW) along State Road 32 and continue east along W Adaline Street.

Funding

The W Adaline Street project is included in Yorktown’s 2026 road improvement program, totaling $690,419.68.

Through the INDOT Community Crossings Matching Grant Program, the State of Indiana provides a 50 percent funding match, significantly expanding the Town’s ability to complete roadway improvements.

Yorktown continues to pursue these competitive grants each year in order to maximize investment in the community’s infrastructure.

What Residents Can Expect

During construction, residents may experience temporary traffic adjustments or short-term access limitations while resurfacing work is completed. Updates will be provided as construction schedules are finalized.

Map of Construction Area

Timeline

Project Start:

June 4, 2026
Traffic control setup and pavement milling begin

Road Preparation:

June 4–8, 2026
Milling and roadway repairs

Paving:

June 12, 2026
Final asphalt surface installed