An artist's impression street view of how the new visitor site will look
Project

About the regeneration project

Find out more about the regeneration project and view the final Outline Albany Park Masterplan and designs for the F Pit Museum development.

Washington F Pit Museum

About the regeneration of Washington F Pit

Washington F Pit Museum is an iconic landmark that showcases a key part of Sunderland's industrial heritage and the history of the mining industry in the region. Located in Albany Park in Washington, the F-Pit Engine House and attached headgear are a Scheduled Ancient Monument and are the only surviving structures of New Washington Colliery. The Engine House was presented by the National Coal Board to the people of Washington as a monument, following its closure in 1968, and it has operated as a Museum since 1976. Albany Park was formed from land reclaimed from the former colliery, its existing landscape having been influenced by the site's mining heritage with the former spoil heaps of the colliery seen in the mounds that characterise the topography of the park.

Following consultation in September 2024, on the outline Albany Park Masterplan and designs for the F Pit Museum, Heritage Visitor Centre and Café, the Park Masterplan has been revised and finalised in response to comments from residents. The key changes and clarifications on other issues raised are summarised below and the final Masterplan can be viewed in the link at the bottom of this page.  

Events area - concerns over increased parking and noise from the relocation of the events area have been acknowledged and this is now retained in its current location to the north of the F Pit Museum. The informal football kickabout field is likewise retained to the south opposite Swirall Edge, whilst the previously proposed vehicular access from Swirral Edge to the events area has been removed. The goalposts will be omitted from the grassed games area to the north that is shared with the events area to reflect concerns about balls being kicked towards pedestrians using the adjacent paths. 

Trees - the proposed trees in the verge to the west of the park have been removed from the Masterplan in recognition that this is an area where visitors park for events like the Washington Carnival. 

Anti-social behaviour - while it is difficult for the park improvements to directly address this key issue, especially in relation to access from motorbikes, they do include various measures to help reduce such behaviour, including improved and more secure entrances to the park, and locating litter bins and new benches away from problem areas. The detailed design of these measures is currently being prepared by the Council's Landscape Team in conjunction with Environmental Services who maintain the park. 

Car Park - the new car park is an important element of the regeneration plans and is located to provide easy access for the new Museum, Heritage Visitor Centre and Café offer, as well as for park users. The existing access to the Museum from the current car park will be reconfigured so that access will be provided through the new Visitor Centre, while options for additional security measures are currently being explored, to provide more legible access and a safer environment for all users.   

The first phase of improvements to the park were completed in June 2024 and comprised woodland management and tree, shrub and wildflower planting to enhance the natural environment of the park. 

The Phase 2 Park Works will commence in November with the drainage improvements and new wetland areas to address issues of flooding and boost biodiversity. The drainage works should be completed in early 2026 and will be confined to the southern half of the park and will limit public access to this area for their duration. Signage has been placed in the park to inform residents of the impending works and proposed temporary footpath closures and diversions that will be needed. The Albany Park Drainage Works Site Boundary plan at the bottom of this page shows the area of the improvement works and the footpaths affected. The Outline Masterplan for Albany Park has also been updated to reflect minor changes to the extent of the wetland areas. 

The remainder of the Phase 2 Park Works, including the access improvements, a refurbished play area, dog exercise area, new paths, bins and benches and signage, more planting and meadow grassland will follow the drainage improvements and are envisaged to be completed by Summer 2026.

The regeneration plans for the F Pit Museum, Heritage Visitor Centre and Café have also been further developed by Mosedale Gillatt Architects, whilst exhibition designers Bright White Ltd are developing concept ideas for the exhibition and interpretation installations for the museum and outdoor exhibition space. 

Updated plans including the final Masterplan can be viewed in the links at the bottom of this page. 

Share your thoughts

Help shape the exhibition stories and interpretation features here before 5pm on Friday 15th August.

Planning drawings showing the proposed site plan

Discover more

y4bmjyqkoygxnjx9aivc.jpg

About the regeneration project

Find out more about the Washington F Pit and Albany Park regeneration project.

Posted:
Read More
Washington F Pit Museum on a sunny day
Closed

Help shape the exhibition stories

Share your thoughts on what the exhibition stories and interpretation features should include

Project:Washington F Pit Museum

Stay Informed

Follow our projects to get notified of upcoming engagements and the latest project related news.