Upgrades to the freshwater pond located at the mid-plateau section of Fort Williams Park, is included as recommendation #24 in the Fort Williams Park Master Plaln. Upgrades include:
In the Spring of 2022, a Request for Expression of Intent & Qualifications for Engineering & Design Services was posted. See RFP
Gorrill Palmer was retained by the Town of Cape Elizabeth to complete a feasibility study for the freshwater pond. The project team includes Gorrill Palmer (GP) as the project lead, Richardson & Associates (R&A) who provided landscape architectural services, Owen Haskell Surveryors who prepared a survey plan for the pond, and Sevee & Maher Engineers (SME) who completed a hydrogeologic study of the pond. See Study
Next steps, sampling of materials for dredging the pond.
STATUS:
January 2025
December 9, 2024