Denton, TX
November 2025 Construction Update
Neighborhood 2 & 6

November 2025 Construction Update

November 2025 Construction Update

Work Packages 2 and 3 are in construction with anticipated completion Q4 2026.

Streets with active construction:

Utilities:

  • Normal (W. Oak / Scripture) – Continue installing reinforced concrete pipe.
  • Alice (Panhandle / Crescent) – Continue installation of sewer lines followed by water mains and laterals.
  • Parkway (Denton / Carroll) – Continue boring water line across Carroll and sewer main folled by water lines.

Earthwork/Flatwork:

  • Amarillo (Haynes / Congress E) – Curb, gutter, driveways, and miscellaneous concrete.
  • Cordell (Coit / Fulton) – Sod, striping, singange, and traffic control removal to be completed.
  • Denton St. (Hickory / Congress E) – ATMOS re-design.
  • Egan (West - Carroll / Anna) - Continue curb, gutter, and miscellaneous concrete work followed by sod and final lift of asphalt.
  • Egan (East - Anna / Bolivar) - Traffic control placement followed by removals.
  • Emery & Fulton - Begin curb and gutter.
  • Mounts (Haynes / Congress E) – Continue curb, gutter, driveways, and miscellaneous concrete work followed by sod.
  • Normal (Scripture / Oak) - Traffic control placed followed by removals.
  • Ponder (Scripture / Grace Temple) – Being curb and gutter.
  • Ponder (Egan / Scripture - Lime followed by fine grading and 1st lift of asphalt.
  • Scripture (Jagoe / Ponder) – ATMOS re-design.
  • Sunset (University / Alice) – Parking lot asphalt to be placed.
  • Welch (Highland / Prairie) – 2nd lift of asphalt compete followed by 3rd lift, striping, signage, and traffic control removal.
  • Welch (Mulberry / Hickory) – Continue curb, gutter, driveways, and miscellaneous concrete work followed by sod and final lift of asphalt.