The traffic control plan setup on January 14, 2026 to accomadate the installation of storm drain lines, laterals and curb inlets will be extended to February 20, 2026.
The week long extention will allow the Contractor to recoop the constuction time lost due to the winterstorm that occured at the end of January 2026.
During the remaining time of the traffic control plan, detour signage will be directing through traffic from US77 to Conquest Drive.