ACHIEVEMENTS:
Steel work completed over the Bays and House
Framers mobilized
Building Dry-In
Box walk with the City team
NEXT STEPS:
Install Metal Roof over Bay area
Complete Duct Work Install
Complete Drywall installation on House Side
FS #5
ACHIEVEMENTS:
Building demoed
Coordination with Bonnie Brae project connections
All piers drilled – with only 10 total piers cased
Water Shutdown
NEXT STEPS:
Pouring Grade Beams
Installation of underground utilities
Slab on Void Pour
Steel fully delivered on site