Phase 6 - Contractor continues to install 16-inch ductile iron pipe along Bonnie Brae
Project

Phase 6 - Contractor continues to install 16-inch ductile iron pipe along Bonnie Brae

The Contractor continues to install the 16-inch ductile iron pipe along Bonnie Brae from Riney Road to Windsor Drive.

Bonnie Brae

The Contractor continues to install the 16-inch ductile iron pipe along Bonnie Brae from Riney Road to Windsor Drive.