Wastewater Lift Station Force Main Replacements
Overview
Force mains are pressurized pipes that use mechanical pumps to keep sewer water flowing through them. All pipes degrade over time, eventually needing repair or replacement. This construction is part of a larger project to install six new PVC and/or HDPE force main connections to lift stations (#1, 2, 4, 10, 12A, and 17) with all new valves, fittings, and appurtenances. The current cast-iron force mains range in age from 59-74 years of age.
Lift Station Locations
- Lift Station 1 - Edgewater Drive at Florida Ave. to Lyndhurst St.
- Lift Station 2 - Edgewater Drive at President St.
- Lift Station 4 - San Jose Drive at Santa Barbara Dr. to San Salvador Dr.
- Lift Station 10 - New York Avenue at Wilkie St.
- Lift Station 12A - Fairway Drive at Palm Blvd. to Demaret Dr.
- Lift Station 17 - Fairway Drive at Mangrum Dr. to Armour Dr.
Current Lift Station Capacity and Usage
- Lift Station 1 - replacing 1360 ft. of pipe, typically carries 73,000 gallons per day
- Lift Station 2 - replacing 3340 ft. of pipe, typically carries 108,000 gallons per day
- Lift Station 4 - replacing 1860 ft. of pipe, typically carries 101,000 gallons per day
- Lift Station 10 - replacing 3080 ft. of pipe, typically carries 706,000 gallons per day
- Lift Station 12A - replacing 1400 ft. of pipe, typically carries 89,000 gallons per day
- Lift Station 17 - replacing 720 ft. of pipe, typically carries 40,000 gallons per day
Full Project Budget
This project utilizes a Pinellas County contract bid from August 2021
- Lift Station 1 - $372,967.00
- Lift Station 2 - $1,126,845.00
- Lift Station 4 - $643,067.00
- Lift Station 10 - $1,259,491.00
- Lift Station 12A - $361,696.00
- Lift Station 17 - $232,362.00
- Design - $219,539
Project Total - $4,215,967 for all 6 lift station and force main replacements.
Completed Lift Stations
- Lift Station 1
- Lift Station 17
- Lift Station 10 - Virginia Lane
Stay Informed
Get notified on upcoming engagements and the latest project related news.
Project Timeline
Scope & Fee
Design Development
Award of Construction Contract
Project Updates
Force Main #10 - Louden Avenue
Work continues along Louden Avenue due to Force Main #10.
Force Main #4 - Bayshore Boulevard from San Salvador to Spring Street
Alt 19/Bayshore Boulevard Closure Beginning July 15 for Infrastructure Improvements
Road Closure - President Street and Broadway
Please be advised of an upcoming road closure on President Street and Broadway
Road Closure - Fairway Drive and Palm Boulevard
Please be advised of an upcoming road closure on Fairway Drive and Palm Boulevard
Road Closure - Edgewater and President Street
Please be advised of an upcoming road closure on Edgewater and President Street
Road Closure - Douglas and Scotland
Please be advised of an upcoming road closure on Douglas and Scotland
Road Closure - Douglas and President Street
Please be advised of an upcoming road closure on Douglas and President Street
Force Main #2 - Broadway & President Street
Please be advised of an upcoming road closure scheduled for May 23, on the south side of President Street & Broadway intersection.
Force Main #12A - Fairway Drive & Palm Boulevard
Please be advised of an upcoming road closure scheduled for May 20, at the intersection of Palm Boulevard & Fairway Drive.
Force Main #2 Intersection of Douglas & President Street
Please be advised of an upcoming intersection closure scheduled for April 29th, lasting approximately two weeks, at the intersection of Douglas & President Street
Force Main #10 James Street
There will be a small road closure scheduled for Wednesday, April 24 – through Friday, May 3 on James Street East side of the Intersection of Louden and James Street. We apologize for any inconvenience.
Force Main #12 -Palm Blvd.
Please be informed of an upcoming eastbound road closure scheduled from Monday, April 15th to April 19th on Palm Blvd from Snead Ave to Demaret Dr.
Force Main #2
Please be advised of an upcoming road closure for Douglas Ave between Scotland St & E Honey Lane due to force main replacement work scheduled from April 1st to April 19th
Force Main #4 - Bayshore Blvd
The road’s southbound lane will be closed and shifted to the middle lane. Also, the entire road will be closed for 2 or 3 days on two separate occasions to work in the middle of the street. We apologize for any inconvenience.
Force Main #10 Virginia Lane
There will be a small road closure scheduled for Monday, February 19 for approximately 3 weeks along Virginia Lane. We apologize for any inconvenience.
Lift Station 4 - San Jose Dr., Santa Barbara Dr., and San Salvador Dr.
There will be a small road closure scheduled for Wednesday, December 6 through Friday, December 15 at the intersection of Santa Barbara and San Jose Drives. We apologize for any inconvenience.
Lift Station 4 - San Jose Dr., Santa Barbara Dr., and San Salvador Dr.
Construction will occur on landscape island near San Jose Park, the east side right-of-way of Santa Barbara Dr., roadway of San Salvador Dr., and along a piece of Bayshore Blvd.
Lift Station 12A - Fairway Drive & Palm Boulevard at Demaret Drive
Construction will occur on the north side of Fairway Drive and the east side of Palm Boulevard. Learn about potential resident impacts.
Lift Station 17 - Fairway Drive at Mangrum Dr. to Armour Dr.
Construction will occur on the north side of Fairway Drive. Learn about potential resident impacts.
Lift Station 1 - Edgewater Drive at Florida Ave. to Lyndhurst St.
Construction will occur on the west side of Edgewater Drive along John Grant Hubbard Park