91st Avenue SE Sidewalk Phase 1
| Project Information: | Project Manager: |
|---|---|
| This project will complete a continuous pedestrian and bicycle route on the east side of 91st Avenue SE, between the intersections with 8th St SE and Market Place. The new continuous route will incorporate existing sidewalk, where possible. | Erik Mangold, PMP Capital Projects Manager Phone: (425) 622-9443 Email: emangold@lakestevenswa.gov |
The new route will provide a pedestrian and bicycle link between nearby neighborhoods, Hillcrest Elementary, Skyline Elementary School, Lake Stevens Middle School, and the commercial area on Market Place.
The project will also construct driveway ramps or provide crosswalk striping as needed where driveways or cross streets meet the new sidewalk. The project, including pedestrian ramps at crosswalks, will be designed and constructed to comply with current Americans with Disabilities Act (ADA) guidelines.
This route is the first of two project phases that will, together, meet an overall goal of the City Transportation Benefit District program by providing a continuous multi-modal connection between Market Place and 20th Street SE.
Lead Design Consultant: KPG-Psomas, Inc.
Stay Informed
Get notified on upcoming engagements and the latest project related news.
Project Delivery Stages
Design
Construction
Project Updates
Multi-Use Path Paving and Road Closure
Paving the Multi-use Path from 8th St SE to 4th St SE
Mid-May Final Design Update
Typical street look for the new shared-use pathway
April/May 2024 Project Update
Public Outreach and Design Review
March 2024 Project Update
Preferred Concept - Shared Use Pathway
January/February 2024
Surveyors and Geotechnical Drilling
December 2023 Project Update
Design for the Project Has Began!
How Does This Project Fit Into The Transportation Benefit Program?