Improving Down Lane Park Together.
Making Down Lane Park Better – Together!
Since 2022, we’ve been working with the community to improve Down Lane Park, N17.
Phases 1 & 2b are complete! Have a look at what’s been delivered and read answers to your FAQs.
What’s next?
If you want to find out more about the future plans, explore our Future Phases FAQs for all the details.
Ynglŷn â'r prosiect
E-bost
Future Phases

Down Lane Park User Forum
If you have an interest in tackling current issues, engaging with future plans for the park and discussing the role the community can play in its long-term management, we want to hear from you.

Completed Works: Frequently Asked Questions (FAQs)
Completed Improvements and Frequently Asked Questions (FAQs)

Get Involved
Want to get involved in the life of the park or attend one of our in-person engagement sessions? Click here to find out more.

Short-Term Lease Opportunity
Invite to Tender
Short-Term Lease Opportunity – Part-Pavilion, Down Lane Park, Park View Road, London N17 9EX
Issue Date: 25 November 2025
Closing Date for Submissions: 12pm, 9 December 2025
Earlier Phases

Down Lane Park Approved Planning Application, Feb 2024
View the Planning Application for Down Lane Park

Down Land Park Landscape Masterplan, Feb 2024
Final planning stage landscape masterplan for Down Lane Park

Summary of May 2023 Public Engagement Feedback
What you told us.

Down Lane Park Improvement project
Find out more about the project.

Analysis and inspiration
Find out more about our analysis of the key changes which can be made in the park and our inspiration for the design work.
Llinell amser
Forming the Community Design Group
Laying the foundations of co-design
Co-design: Park concept designs (Options 1 & 2)
Public Engagement # 1
Independent Design Review # 1
Co-design: Park (detailed) & Community Hub (concept) design
Public Engagement # 2
Independent Design Review # 2
Assessing cost, affordability & equality
Planning Application & Planning Authority decision
Detailed Construction Design (Phase 1 works)
Delivery (Construction) Phase 1 Improvement Works
Construction Design (Phases 2-4)
Delivery (Construction) Phase 2b Improvement Works
Reviewing cost, affordability and resident priorities (Phase 2a and Phase 3)
Planning Application & Planning Authority decision
Start on Site: Phase 2a Improvement Works
Start on Site: Phase 3 Improvement Works
News
Pop‑Up Engagement Event at Down Lane Park
Join us at our pop‑up engagement event and help shape the new under‑12s play area at Down Lane Park.We’ll be sharing our updated plans for the park and inviting children, families and local residents
Pop-up engagement event on Saturday 24 January in Down Lane Park.
Join our pop-up engagement event and help co-design the new under-12s play area. In the new year we will be hosting a community pop-up event to share the councils updated plans for Down Lane Park

Work is in progress to improve community facilities in Down Lane Park!
We’re moving forward with improvements to make Down Lane Park an even better place for the community to enjoy. Here’s what’s coming:New Playground & Entrance: The former bowling green will stay cl

Fun activities for free in Down Lane Park
Haringey Council are extending their summer programme of free activities at Down Lane Park on until the end of October, and have added some new activities for different ages. Just turn up to join in t

Feedback Summary and Project Update
Thank you to everyone who responded to the online survey and attended the in-person meetings in May and thank you for your patients while we collated and reviewed all of your feedback.We have produced

Last chance to complete our Feedback Form!
Remember to have your say on future improvements to Down Lane Park by completing our feedback form online, which is due to close Friday 30th May.Your comments will be used to inform the next steps for

Opportunity to feedback on our plans for future phases at Down Lane Park
We have launched an online feedback form so you can feedback on the revised plans for future phases at Down Lane Park.You can view the revised plans for future phases and share your feedback here

Design Proposals Workshop, this evening, 6-7pm at Welbourne Primary
We look forward to welcoming residents and park users to the workshop this evening from 6-7pm at Welbourne Primary School. Please use the entrance gate from High Cross Road. At the workshop offic

Design Proposals Workshop - Wednesday 14th May 6-7pm
The next workshop is scheduled for Wednesday 14th May from 6-7pm at Welbourne Primary School. As before, please use the entrance gate from High Cross Road. At this workshop we will invite residents an

Down Lane Park Design Proposals Workshop
Hi All,Thank you for your patience while we obtained confirmation of our room booking for this evenings meeting. We will be hosting this evening workshop at Harris Academy Tottenham Secondary Sch

UPDATED: Down Lane Park Community Q&A and Updates Meeting
Dear All, Thank you for your patience while we finalised a venue for tomorrow evenings Q&A meeting. Unfortunately, there has been limited availability, so it has taken some time to find

Down Lane Park Q&A and Updates meeting
Dear Park User,I hope you are well and that you are enjoying the completed Phase 1 and 2b of the improvements to Down Lane Park.It is disappointing news that Living Under One Sun have decided not to c

Second phase of Down Lane Park improvements are complete!
The new play area for young people over 12 opened at the end of December, significantly enhancing the park's facilities. The latest play facilities in the park include: A new 11-meter play tower with

Community Activities in the Park and plans for the Woodland Play Area (Phase 2b)
Neighbourhood Green and Healthy Living Festival Join Living Under One Sun for a day of family activities, live music, and food, at the Neighbourhood Green and Healthy Living Festival this Saturda

Phase 2b Improvements. Access restrictions and Diversions
Down Lane Park Improvements (Phase 2b) are underway, continuing until December 2023. As part of our exciting programme of green and open spaces improvements the next phase of the Down Lane P

First phase of Down Lane Park Improvements complete!
First phase of Down Lane Park improvements are now open to the public On Friday 2nd August the remaining phase 1 works opened to the public, concluding the delivery of the phase 1 improvements, c

Down Lane Park Phase 1 works are almost complete!
Community Design Group Phase 1 Sneak Preview Earlier this week Tottenham Hale Ward and Cabinet Member for Placemaking & House Building Cllr Ruth Gordon met with members of the&

Learn to build a dead hedge for wildlife at Down Lane Park, as part of the improvement works.
Join us at Down Lane Park on Saturday 29 June, 10am - 2:30pm and learn how to build a dead hedge as part of ongoing improvement works! As part of the ongoing improvements to Down Lane Park, TCV H

Opportunity for women and girls to boost their green skills
Join Living Under One Sun and Go Grow With Love for a 10 week land based programme to learn all about food and land heritage, organic food growing, soil care, preparation, cultivation, harvest an

Phase 1 Improvements: Frequently Asked Questions, January 2024 - June 2024 (April Update)
Tree management works will be undertaken in Down Lane Park in the week commencing Monday 22 April. The works will involve lifting low tree canopies, trimming around lighting columns, and re

Community Design Group Phase 1 site visit
Down Lane Park Phase 1 Site Visit On Saturday, 9th March Haringey Cllrs Ruth Gordon, Mike Hakata, Emily Arkell, and Sean O’Donovan met in Down Lane Park with members of the Community Design

Phase 1 Improvement Works: Frequently Asked Questions (FAQs)
Thank you to everyone who have been in touch about the Down Lane Park improvement project. We are working hard to minimise the disruption caused by the Phase 1 works, as we will in subsequent Phases.

Co-designed improvements to Down Lane Park given go ahead
Community-led plans for the wide-scale transformation of Down Lane Park for the benefit of the Tottenham Hale community have taken a huge step forward. On Monday evening, Haringey Council’s Planning S

Phase 1 park improvements to start on site 15th January 2024
Phase 1 of improvements to Down Lane Park will start on site on Monday, 15th January 2024. Following nearly two years of co-design with the local community, 20 co-design meetings with the local Commu

Co-designed improvements to Down Lane Park submitted for planning
Community-led plans to deliver major improvements to Down Lane Park in Tottenham Hale have been submitted to Haringey Council. You can view a selection of key images illustrating the proposals by clic

Get involved! Join the Park User & Community Forum and help select the committee for this next year.
The Down Lane Park User and Community Forum will be holding it’s Annual general Meeting on Saturday 11 November from 2-3:30pm at Living Under One Sun Community Hub. This is a big milestone for the gr

Summary of Public Engagement & Landscape Masterplan
Since February 2022 Haringey Council and a Community Design Group (CDG) made up of local residents and community representatives, have been working with landscape architects Levitt Bernstein Associate

Improved community access to Harris Academy Tottenham sports and performance hire facilities
During co-design and throughout public engagement in Oct -Dec ’22 and May ’23 residents and park users told us that the sports facilities in Down Lane Park (Artificial Grass Pitch and Tennis courts) a

Transformation of Tottenham Hale open spaces gets £6m cash boost
Community-led plans to deliver two of the most ambitious parks projects in the capital have moved a step closer thanks to a massive £6m cash injection from Haringey Council. View the full update her
Thank you for your support and participation - June 23
We would like to take a moment to express our thanks to each and every one of you who joined us at our events and workshops and took the time to complete our survey. Your presence, enthusiasm, and unw
Cllr Ruth Gordon invites residents and park users to feedback on proposals for Down Lane Park
Cllr Ruth Gordon, Cabinet Member for House-Building, Placemaking and Development, invites residents and park users to attend one of a series of public engagement events or complete the on-line survey

Down Lane Park public engagement and on-line survey now live! Have your Say!
Two weeks of public engagement inviting resident and park user feedback on the latest design proposals for Down Lane Park is now live! The first of two themed workshops on ‘sports, recreation and spac

Help shape plans to improve Down Lane Park
See the updated park design proposals – Monday 15 May to Sunday 28 May. The latest park design proposals draw on the valuable feedback and advice provided by park users and residents, received through

Community-led plans to improve Down Lane Park get £750,000 funding boost
Community-led plans to improve Down Lane Park have received a £750,000 boost from the Mayor of London’s Green and Resilient Spaces Fund (GRSF) round two. The project received GRSF development funding

Down Lane Park Improvement – Community Researchers
When we engaged around the early stage designs for Down Lane Park in October 2022, we didn’t reach as many young people as we would have liked. To address this the Council has been working with young

Down Lane Park Improvement - Engagement Summary (findings to date)
Thank you to everyone who shared their thoughts on plans for early-stage designs for Down Lane Park. In total, we welcomed 100 people to three in-person engagement events and received 134 responses t

Frequently Asked Questions - Update on Ashley Gardens development, Ashley Road, Tottenham Hale
Frequently Asked Questions - Update on Ashley Gardens development, Ashley Road, Tottenham Hale Down Lane Park_Frequently Asked Questions_Dec 2022.pdf Further to the FAQs and clarifications shared by t

Survey prize draw winners receive ASDA vouchers
The three-week period of public engagement around early-stage design options for Down Lane Park has now concluded. Over 100 people came to our face-to-face engagement events, and we received 118 compl

Come to a ‘pop up’ engagement event in Down Lane Park, 10.30 – 1.00pm, Saturday, 22nd October
We’ll be in Down Lane Park 10.30 – 1.00pm, Saturday 22nd October to talk to you about the two early-stage design options for Down Lane Park. Please do come along, see the park design options, talk to

Eary stage design options for Down Lane Park subjected to independent design review
Supported by the Mayor of London, the two early-stage design options for Down Lane Park have been reviewed by Urban Design London's Environmental Design Review Panel. UDL is a not-for-profit organ

View the models of the two design options we're engaging around and provide your feedback
Join us at our next in person 'drop in' engagement event 3.30 - 7.00pm, Thursday, 13th October 2022 at Mitchley Road Hall, N17 9HG

Down Lane Park Outdoor Public Exhibition: Come and see and provide feedback on the early-stage design options
Have your say ! The engagement boards display the two park design options we are seeking feedback on, as well as more information about the proposed approach and options for entrances and boundaries

Down Lane Park Improvement Engagement Events, 3rd - 23rd October 2022
11.00 -4.00pm, Saturday 8th October at Living Under One Sun Community Hub in Down Lane Park, N17 9EX 3.30 - 7.00pm, Thursday, 13th October at Mitchley Road Hall, Mitchley Road, N17 9HG or You can view
Cyfarfod â'r tîm

Haringey Council is leading this project, working with the Community Design Group and our appointed design team, lead by Levitt Bernstein Architects.
At the start of this year, we set out to develop a vision for the future of Down Lane Park. Together we have developed two early design options which we want to hear your feedback on.

Levitt Bernstein is a multi-disciplinary practice of architects, landscape architects and urban designers. For the Down Lane Park project we are leading a design team of others specialists in areas such as lighting, ecology, drainage, inclusive access and structural engineering.
We are proud to be involved in this transformative project, working with
the community design group and realising ambitions local people have for Down Lane Park. We have a strong track-record in public park design and have devised new masterplans for several public parks in London. These have included inclusive play, sports and leisure provision, new planting strategies, sustainable drainage principles and public art integration.
We are award-winning designers and place great emphasis in putting the needs of people at the heart of our work. Each of our projects is unique but the driving force behind every one is the desire to create an
environment that is beautiful, sustainable and functional.
The Community Design Group (CDG), made up of volunteers local community representatives and elected Councillors, is working with the design team to shape the design proposals for the park, supported by Council officers.
As local residents, representatives of different interest groups, and park users they bring an in-depth knowledge of the area and lived-experience to the project.

Coherent Cities helps organisations communicate, collaborate and compete more coherently, based on the premise that all successes – and most failures – come back to people. We believe the way to give projects and teams more traction is by helping the people involved be more effective, whether that’s through confidence, sector intelligence, inclusion, finding common language or finding the right partners.
Director Lisa Taylor is the connector and core of the company, delivering the services on this site. We also coordinate associate input, adding socio-economic, placemaking and masterplanning consultancy; political, policy and demographic research; sustainability assessment; cross-sector recruiting; organisational development and more.

Huntley Cartwright provide Quantity surveying and construction cost management advice.
We control and manage project costs from inception to completion with integrated risk, change and value management procedures.
We are able to advise on procurement and contract strategies, prepare tender documentation, administer the tender process and manage the appointment of the contractor.
During the construction stage we value work completed, prepare regular financial reports, agree the cost of changes and on completion, agree the final account. At all stages, we manage and keep clients informed of the final project cost.

THD Consulting Engineers was established in 2005 and offers comprehensive Mechanical, Electrical and Plumbing (MEP) design service from concept to completion led by highly experienced engineers.

We are engineers with a passion and expertise in the design and delivery of high quality award winning buildings, structures and public spaces.
Our engineering skills cover both structural and civil, including movement, highways, flood risk, drainage, sustainable drainage and earthworks amongst others.
Civic Engineering is the fusion of all these skills. We believe this fusion of expertise is essential to resolving the complex and competing needs of our towns and cities, leading to the design of innovative, sustainable and economically viable structures, neighbourhoods and environments, where we seek to work with the prevailing geography of a place

Light Follows Behaviour has a fresh approach to lighting design: more inclusive, more meaningful, more engaging. Light is the powerful tool we use to change spaces and cities.
Based in London we go wherever our projects take us, because the place and its people are the most important and inspiring starting points.
We are strategic thinkers with a critical understanding of how urban design and architecture flourish through light. Transforming cities and spaces needs collective, radical approaches; so through our work we weave the disciplines of social researchers, urban planners, architects, brand designers, and (other) lighting designers. Their knowledge, skills and experiences allow us to deliver the strategies that build unique and sustainable experiences of light.
Contact Team
Llinell amser
Forming the Community Design Group
Laying the foundations of co-design
Co-design: Park concept designs (Options 1 & 2)
Public Engagement # 1
Independent Design Review # 1
Co-design: Park (detailed) & Community Hub (concept) design
Public Engagement # 2
Independent Design Review # 2
Assessing cost, affordability & equality
Planning Application & Planning Authority decision
Detailed Construction Design (Phase 1 works)
Delivery (Construction) Phase 1 Improvement Works
Construction Design (Phases 2-4)
Delivery (Construction) Phase 2b Improvement Works
Reviewing cost, affordability and resident priorities (Phase 2a and Phase 3)
Planning Application & Planning Authority decision
Start on Site: Phase 2a Improvement Works
Start on Site: Phase 3 Improvement Works
News
Pop‑Up Engagement Event at Down Lane Park
Join us at our pop‑up engagement event and help shape the new under‑12s play area at Down Lane Park.We’ll be sharing our updated plans for the park and inviting children, families and local residents
Pop-up engagement event on Saturday 24 January in Down Lane Park.
Join our pop-up engagement event and help co-design the new under-12s play area. In the new year we will be hosting a community pop-up event to share the councils updated plans for Down Lane Park

Work is in progress to improve community facilities in Down Lane Park!
We’re moving forward with improvements to make Down Lane Park an even better place for the community to enjoy. Here’s what’s coming:New Playground & Entrance: The former bowling green will stay cl

Fun activities for free in Down Lane Park
Haringey Council are extending their summer programme of free activities at Down Lane Park on until the end of October, and have added some new activities for different ages. Just turn up to join in t

Feedback Summary and Project Update
Thank you to everyone who responded to the online survey and attended the in-person meetings in May and thank you for your patients while we collated and reviewed all of your feedback.We have produced

Last chance to complete our Feedback Form!
Remember to have your say on future improvements to Down Lane Park by completing our feedback form online, which is due to close Friday 30th May.Your comments will be used to inform the next steps for

Opportunity to feedback on our plans for future phases at Down Lane Park
We have launched an online feedback form so you can feedback on the revised plans for future phases at Down Lane Park.You can view the revised plans for future phases and share your feedback here

Design Proposals Workshop, this evening, 6-7pm at Welbourne Primary
We look forward to welcoming residents and park users to the workshop this evening from 6-7pm at Welbourne Primary School. Please use the entrance gate from High Cross Road. At the workshop offic

Design Proposals Workshop - Wednesday 14th May 6-7pm
The next workshop is scheduled for Wednesday 14th May from 6-7pm at Welbourne Primary School. As before, please use the entrance gate from High Cross Road. At this workshop we will invite residents an

Down Lane Park Design Proposals Workshop
Hi All,Thank you for your patience while we obtained confirmation of our room booking for this evenings meeting. We will be hosting this evening workshop at Harris Academy Tottenham Secondary Sch

UPDATED: Down Lane Park Community Q&A and Updates Meeting
Dear All, Thank you for your patience while we finalised a venue for tomorrow evenings Q&A meeting. Unfortunately, there has been limited availability, so it has taken some time to find

Down Lane Park Q&A and Updates meeting
Dear Park User,I hope you are well and that you are enjoying the completed Phase 1 and 2b of the improvements to Down Lane Park.It is disappointing news that Living Under One Sun have decided not to c

Second phase of Down Lane Park improvements are complete!
The new play area for young people over 12 opened at the end of December, significantly enhancing the park's facilities. The latest play facilities in the park include: A new 11-meter play tower with

Community Activities in the Park and plans for the Woodland Play Area (Phase 2b)
Neighbourhood Green and Healthy Living Festival Join Living Under One Sun for a day of family activities, live music, and food, at the Neighbourhood Green and Healthy Living Festival this Saturda

Phase 2b Improvements. Access restrictions and Diversions
Down Lane Park Improvements (Phase 2b) are underway, continuing until December 2023. As part of our exciting programme of green and open spaces improvements the next phase of the Down Lane P

First phase of Down Lane Park Improvements complete!
First phase of Down Lane Park improvements are now open to the public On Friday 2nd August the remaining phase 1 works opened to the public, concluding the delivery of the phase 1 improvements, c

Down Lane Park Phase 1 works are almost complete!
Community Design Group Phase 1 Sneak Preview Earlier this week Tottenham Hale Ward and Cabinet Member for Placemaking & House Building Cllr Ruth Gordon met with members of the&

Learn to build a dead hedge for wildlife at Down Lane Park, as part of the improvement works.
Join us at Down Lane Park on Saturday 29 June, 10am - 2:30pm and learn how to build a dead hedge as part of ongoing improvement works! As part of the ongoing improvements to Down Lane Park, TCV H

Opportunity for women and girls to boost their green skills
Join Living Under One Sun and Go Grow With Love for a 10 week land based programme to learn all about food and land heritage, organic food growing, soil care, preparation, cultivation, harvest an

Phase 1 Improvements: Frequently Asked Questions, January 2024 - June 2024 (April Update)
Tree management works will be undertaken in Down Lane Park in the week commencing Monday 22 April. The works will involve lifting low tree canopies, trimming around lighting columns, and re

Community Design Group Phase 1 site visit
Down Lane Park Phase 1 Site Visit On Saturday, 9th March Haringey Cllrs Ruth Gordon, Mike Hakata, Emily Arkell, and Sean O’Donovan met in Down Lane Park with members of the Community Design

Phase 1 Improvement Works: Frequently Asked Questions (FAQs)
Thank you to everyone who have been in touch about the Down Lane Park improvement project. We are working hard to minimise the disruption caused by the Phase 1 works, as we will in subsequent Phases.

Co-designed improvements to Down Lane Park given go ahead
Community-led plans for the wide-scale transformation of Down Lane Park for the benefit of the Tottenham Hale community have taken a huge step forward. On Monday evening, Haringey Council’s Planning S

Phase 1 park improvements to start on site 15th January 2024
Phase 1 of improvements to Down Lane Park will start on site on Monday, 15th January 2024. Following nearly two years of co-design with the local community, 20 co-design meetings with the local Commu

Co-designed improvements to Down Lane Park submitted for planning
Community-led plans to deliver major improvements to Down Lane Park in Tottenham Hale have been submitted to Haringey Council. You can view a selection of key images illustrating the proposals by clic

Get involved! Join the Park User & Community Forum and help select the committee for this next year.
The Down Lane Park User and Community Forum will be holding it’s Annual general Meeting on Saturday 11 November from 2-3:30pm at Living Under One Sun Community Hub. This is a big milestone for the gr

Summary of Public Engagement & Landscape Masterplan
Since February 2022 Haringey Council and a Community Design Group (CDG) made up of local residents and community representatives, have been working with landscape architects Levitt Bernstein Associate

Improved community access to Harris Academy Tottenham sports and performance hire facilities
During co-design and throughout public engagement in Oct -Dec ’22 and May ’23 residents and park users told us that the sports facilities in Down Lane Park (Artificial Grass Pitch and Tennis courts) a

Transformation of Tottenham Hale open spaces gets £6m cash boost
Community-led plans to deliver two of the most ambitious parks projects in the capital have moved a step closer thanks to a massive £6m cash injection from Haringey Council. View the full update her
Thank you for your support and participation - June 23
We would like to take a moment to express our thanks to each and every one of you who joined us at our events and workshops and took the time to complete our survey. Your presence, enthusiasm, and unw
Cllr Ruth Gordon invites residents and park users to feedback on proposals for Down Lane Park
Cllr Ruth Gordon, Cabinet Member for House-Building, Placemaking and Development, invites residents and park users to attend one of a series of public engagement events or complete the on-line survey

Down Lane Park public engagement and on-line survey now live! Have your Say!
Two weeks of public engagement inviting resident and park user feedback on the latest design proposals for Down Lane Park is now live! The first of two themed workshops on ‘sports, recreation and spac

Help shape plans to improve Down Lane Park
See the updated park design proposals – Monday 15 May to Sunday 28 May. The latest park design proposals draw on the valuable feedback and advice provided by park users and residents, received through

Community-led plans to improve Down Lane Park get £750,000 funding boost
Community-led plans to improve Down Lane Park have received a £750,000 boost from the Mayor of London’s Green and Resilient Spaces Fund (GRSF) round two. The project received GRSF development funding

Down Lane Park Improvement – Community Researchers
When we engaged around the early stage designs for Down Lane Park in October 2022, we didn’t reach as many young people as we would have liked. To address this the Council has been working with young

Down Lane Park Improvement - Engagement Summary (findings to date)
Thank you to everyone who shared their thoughts on plans for early-stage designs for Down Lane Park. In total, we welcomed 100 people to three in-person engagement events and received 134 responses t

Frequently Asked Questions - Update on Ashley Gardens development, Ashley Road, Tottenham Hale
Frequently Asked Questions - Update on Ashley Gardens development, Ashley Road, Tottenham Hale Down Lane Park_Frequently Asked Questions_Dec 2022.pdf Further to the FAQs and clarifications shared by t

Survey prize draw winners receive ASDA vouchers
The three-week period of public engagement around early-stage design options for Down Lane Park has now concluded. Over 100 people came to our face-to-face engagement events, and we received 118 compl

Come to a ‘pop up’ engagement event in Down Lane Park, 10.30 – 1.00pm, Saturday, 22nd October
We’ll be in Down Lane Park 10.30 – 1.00pm, Saturday 22nd October to talk to you about the two early-stage design options for Down Lane Park. Please do come along, see the park design options, talk to

Eary stage design options for Down Lane Park subjected to independent design review
Supported by the Mayor of London, the two early-stage design options for Down Lane Park have been reviewed by Urban Design London's Environmental Design Review Panel. UDL is a not-for-profit organ

View the models of the two design options we're engaging around and provide your feedback
Join us at our next in person 'drop in' engagement event 3.30 - 7.00pm, Thursday, 13th October 2022 at Mitchley Road Hall, N17 9HG

Down Lane Park Outdoor Public Exhibition: Come and see and provide feedback on the early-stage design options
Have your say ! The engagement boards display the two park design options we are seeking feedback on, as well as more information about the proposed approach and options for entrances and boundaries

Down Lane Park Improvement Engagement Events, 3rd - 23rd October 2022
11.00 -4.00pm, Saturday 8th October at Living Under One Sun Community Hub in Down Lane Park, N17 9EX 3.30 - 7.00pm, Thursday, 13th October at Mitchley Road Hall, Mitchley Road, N17 9HG or You can view
Proposals
Have your say and help shape the future of your community.
HAVE YOUR SAY

Feedback form closed.
Thank you for your feedback on the revised plans for future phases. We are review your responses and will share a summary soon.

Get Involved
Want to get involved in the life of the park or attend one of our in-person engagement sessions? Click here to find out more.

Completed Works: Frequently Asked Questions (FAQs)
Completed Improvements and Frequently Asked Questions (FAQs)

Down Lane Park Approved Planning Application, Feb 2024
View the Planning Application for Down Lane Park

Down Land Park Landscape Masterplan, Feb 2024
Final planning stage landscape masterplan for Down Lane Park

May 2023 Public Engagement Design Proposals
View the May '23 park improvement design proposals.

Summary of May 2023 Public Engagement Feedback
What you told us.

Have your say!
Take the on-line survey and let us hear your views on the updated proposals.

Summary of Oct -Dec '22 Public Engagement Feedback
Summary of responses to early-stage design options

Down Lane Park Improvement project
Find out more about the project.

Your feedback so far...
Here you can find a summary of the feedback we've received from you so far.

Down Lane Park User Forum
If you have an interest in tackling current issues, engaging with future plans for the park and discussing the role the community can play in its long-term management, we want to hear from you.
Team
Let's introduce you to the team

Haringey Council is leading this project, working with the Community Design Group and our appointed design team, lead by Levitt Bernstein Architects.
At the start of this year, we set out to develop a vision for the future of Down Lane Park. Together we have developed two early design options which we want to hear your feedback on.

Levitt Bernstein is a multi-disciplinary practice of architects, landscape architects and urban designers. For the Down Lane Park project we are leading a design team of others specialists in areas such as lighting, ecology, drainage, inclusive access and structural engineering.
We are proud to be involved in this transformative project, working with
the community design group and realising ambitions local people have for Down Lane Park. We have a strong track-record in public park design and have devised new masterplans for several public parks in London. These have included inclusive play, sports and leisure provision, new planting strategies, sustainable drainage principles and public art integration.
We are award-winning designers and place great emphasis in putting the needs of people at the heart of our work. Each of our projects is unique but the driving force behind every one is the desire to create an
environment that is beautiful, sustainable and functional.
The Community Design Group (CDG), made up of volunteers local community representatives and elected Councillors, is working with the design team to shape the design proposals for the park, supported by Council officers.
As local residents, representatives of different interest groups, and park users they bring an in-depth knowledge of the area and lived-experience to the project.

Coherent Cities helps organisations communicate, collaborate and compete more coherently, based on the premise that all successes – and most failures – come back to people. We believe the way to give projects and teams more traction is by helping the people involved be more effective, whether that’s through confidence, sector intelligence, inclusion, finding common language or finding the right partners.
Director Lisa Taylor is the connector and core of the company, delivering the services on this site. We also coordinate associate input, adding socio-economic, placemaking and masterplanning consultancy; political, policy and demographic research; sustainability assessment; cross-sector recruiting; organisational development and more.

Huntley Cartwright provide Quantity surveying and construction cost management advice.
We control and manage project costs from inception to completion with integrated risk, change and value management procedures.
We are able to advise on procurement and contract strategies, prepare tender documentation, administer the tender process and manage the appointment of the contractor.
During the construction stage we value work completed, prepare regular financial reports, agree the cost of changes and on completion, agree the final account. At all stages, we manage and keep clients informed of the final project cost.

THD Consulting Engineers was established in 2005 and offers comprehensive Mechanical, Electrical and Plumbing (MEP) design service from concept to completion led by highly experienced engineers.

We are engineers with a passion and expertise in the design and delivery of high quality award winning buildings, structures and public spaces.
Our engineering skills cover both structural and civil, including movement, highways, flood risk, drainage, sustainable drainage and earthworks amongst others.
Civic Engineering is the fusion of all these skills. We believe this fusion of expertise is essential to resolving the complex and competing needs of our towns and cities, leading to the design of innovative, sustainable and economically viable structures, neighbourhoods and environments, where we seek to work with the prevailing geography of a place

Light Follows Behaviour has a fresh approach to lighting design: more inclusive, more meaningful, more engaging. Light is the powerful tool we use to change spaces and cities.
Based in London we go wherever our projects take us, because the place and its people are the most important and inspiring starting points.
We are strategic thinkers with a critical understanding of how urban design and architecture flourish through light. Transforming cities and spaces needs collective, radical approaches; so through our work we weave the disciplines of social researchers, urban planners, architects, brand designers, and (other) lighting designers. Their knowledge, skills and experiences allow us to deliver the strategies that build unique and sustainable experiences of light.