Your feedback so far

Find out what you've told us matters to you.

Down Lane Park Improvement

Your feedback so far...

What you've told us matters to you

We carried out Park User Surveys in Spring 2021 to better understand how people currently use the park and what you would like to see improved in the future. We received 278 survey responses, 318 on-line comments, and lots of valuable feedback via four on-line meetings. You can view the survey summary report here.

Down Lane Park User Survey Summary Report, March 2021

Image shows the front cover of the Down Lane Park User Survey Summary Report from March 2021, including info-graphics of the number of survey respondents

Further feedback from the community has been collected this year and a summary of what you’ve told us is set out below.

 Key park improvement themes:The image lists out key themes under four sub-headings: ecology, safety, facilities, and function. Under ecology the key themes are listed as: more trees, more wildflower planting, and different hedges. Under safety the key themes are listed as: improve lighting and CCTV, redesign underused areas, longer café opening hours. Under facilities the key themes are listed as: widened footpaths, improve seating and signage, outdoor performance space. Under function the key themes are listed as: more toilets and bins, improved drainage, relocate park depot building somewhere else.

Ecology

Residents and park users want to see more trees, wildflowers, and planting.

Some engagement respondents also feel different hedges should be introduced to the park.

Generally, the featurelessness of the green spaces in park are considered an opportunity to be addressed. 

Safety

The need for lighting throughout the park to aid safety are key issues for residents and users. Particularly around the Community Hub, nursery, and main routes. 

Secluded or underused spaces are felt in need of redesign.

The Park View Underpass route to Tottenham Marshes is considered unsafe and in need of improvement. 

Some people do not feel comfortable walking along the main diagonal pathway, for fear of being struck by flying (foot)balls

People also want CCTV to be installed.

Facilities

People find the park’s pathways too narrow and want to see them widened.

Entrances to the park could be improved to be more welcoming and accessible with better signage 

The play area isn’t as well used as in other parks. People feel it could be better, and possibly located away from cars and pollution.

The need for improved and more accessible and inclusive seating has come across strongly.  

The Community Hub is an asset for the park. People wanted this to be open longer and more often, with a café and activities for all ages.

There is also some support for a space within the park for events or performance.

Function

Providing accessible and inclusive toilets, more bins, and a cleaner park that is better maintained are amongst the most cited asks.

Surface water flooding is seen as an issue and better drainage requested so that the whole of the park can be used throughout the year.

People have suggested the park depot building near the Artificial Grass Pitch could be relocated.


Summary

This early phase of engagement highlighted the commitment, history of hard work, and continued interest in ensuring improvements are shaped and informed by local residents and park users.

The range of issues raised reiterates the challenges and opportunities that need to be addressed through good design.

Through the next stages of the project we will continue to offer opportunities for engagement, information exchange and capacity building, ensuring residents and users are able to help shape the future of Down Lane Park.