
Trees, planting and sustainable drainage
Find out more about Sustainable Drainage System
Walton Local Street Improvements
Trees, planting and sustainable drainage
Trees and planting
As part of Surrey's climate strategy, the Council are working with communities across Surrey to plant 1.2 million new trees by 2030.
Urban trees have a number of benefits for an area and its residents including for air quality, health and wellbeing, education and climate change adaption.. For more information please see: Surrey's New Tree Strategy 2020 - Surrey County Council (surreycc.gov.uk).
Through this scheme, we have considered several locations across the Walton-on-Thames area that would be suitable for tree planting. The locations chosen are either on existing verge space, providing an attractive traffic calming feature.
As well as tree planting, other types of planting and the formation of rain gardens are being considered, acting as sustainable drainage features in the urban environment.
The locations of the trees proposed in this scheme can be found on our area plans.
How you can help
In order for these new trees to thrive and have the best chance at surviving in the long term, we require the help of local volunteers to assist with watering and other maintenance.
We are also keen to hear if residents have any other ideas for suitable locations for planting.
If you are interested in being part of this work or have any ideas, please email us at: localstreetimprovements@surreycc.gov.uk.
Sustainable drainage
Sustainable drainage systems are considered to be a natural approach to managing surface water runoff. They reduce surface water flooding and bring biodiversity benefits by increasing water storage capacity.
Rain gardens are an example of sustainable drainage. They are small depressions in the ground planted with materials that water can soak through and can withstand some temporary flooding. This is important as it slows surface water run off thus reducing the risk of flooding.
Rain gardens are attractive features in an area that can not only improve the public realm but also bring traffic calming benefits.
Discover more

Stage 3 Engagement Report
Read our engagement stage 3 report which describes the engagement process and summarises responses received

You Said, We Did
View a list of the key changes compared to the previous stage of engagement

Parking in Walton-on-Thames
View information on parking in the Walton-on-Thames LSI

Felix Road and Franklyn Road (Area 3)
View the updated design proposals for Felix Road, Franklyn Road and surrounding roads

Manor Road and surrounding roads (Area 2)
View the updated design proposals for Manor Road and surrounding roads

Bridge Street and surrounding roads (Area 1)
View the updated design proposals for Bridge Street and surrounding roads

Area wide measures
Find out more and give your feedback on the area wide measures

Stage 2 Engagement Report
Read our engagement stage 2 report below which describes the engagement process and summarises the responses received during the second stage of engagement for the Walton-on-Thames Local Street Improv

Survey
This survey was used for engagement stage 2 and is now closed
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.
