
Hyde Park to Marylebone Cycleway (C43)
Route: Stanhope Place, Connaught Square, Connaught Street, Porchester Place, Kendal Street and George Street.
Westminster City Council have published their “You Said, We Did” report addressing the main points raised during the Hyde Park to Marylebone Cycleway (C43) Public Consultation and outlining the Council’s response to these. To view the report, please follow this link.
Look Back at - You said, we did - C43 Cycleway (commonplace.is)

Introduction
Westminster City Council, in partnership with Transport for London, is proposing to deliver a new cycle route, Cycleway 43, connecting Hyde Park with the existing facilities at Gloucester Place. The C43 route is proposed to run via Stanhope Place, Connaught Square, Connaught Street, Porchester Place, Kendal Street and George Street. The proposed route is part of the Westminster cycle route programme and would become part of the London wide Cycleway network (previously known as Cycle Superhighways and Quietways).
In December 2021, Westminster City Council’s Cabinet Member for City Management and Air Quality approved the route of Cycleway 43 between Bayswater Road and Gloucester Place. We originally consulted on the route in 2016 as ‘Quietway 7’. Since then, proposals have changed substantially to meet up to date cycling standards. In May - June 2023 we asked for your views on the updated proposals during this initial design stage to refine and improve them further.
The proposed new Cycleway 43 route will also connect with the proposed Cycleway 51 (previously consulted on as Quietway 16, St. John’s Wood to Marylebone) at Bryanston Square and the existing Cycleway 27 (C27) connecting to Paddington at Norfolk Crescent.
The scheme aims to enhance cycle safety and connectivity between Hyde Park and Marylebone with improvements to nine junctions. It will benefit all people who want to walk and cycle in the area. Proposed changes include:
- Wider and less cluttered footways
- Shortened pedestrian crossing points
- Improvement of cycle facilities
- Introduction of traffic calming features
- Reallocation of parking to make the route safer
- Clear cycle route wayfinding signs
- Additional trees and benches
The Proposals
Detailed below is a description of the proposed changes, to introduce the approved cycleway.
- The junction of Stanhope Place and Bayswater Road is proposed to become a cycle only junction to make crossing Baywater Road by bike safer. General traffic can still access Bayswater Road via Edgware Road and Albion Street.
- At the Stanhope Place – Seymour Place - Connaught Square junction we are proposing a new raised table and the removal of one lane at the junction (right turns will still be permitted) to allow space for footway extensions to reduce pedestrian crossing distances.
- Wider footway for cycle parking and potential bench locations at the Stanhope Place – Seymour Place - Connaught Square junction.
- Footway extensions on Connaught Street between Connaught Square and Porchester Place as well as raised junction entrances to creat safe, direct and accessible walking routes.
- Footway extensions at the Porchester Place junctions with Kendal Street and with Porchester Place.
- New cycling connection with C27 to Paddington along Norfolk Crescent.
- Mandatory cycle lanes (cycle lanes that other vehicles are not allowed to enter) on Kendal Street, up to Edgware Road.
- Raised cycle tracks along George Street. This creates a protected cycle route with a physical separation between the cycle lane and general traffic lanes with kerbs at different hight.
- New advanced stops lines (where people cycling can wait ahead of the traffic at traffic lights), to help cyclists get in front of general traffic.
- Improvement of the traffic signals at the George Street – Seymour Street junction to include signalised pedestrian crossing.
- Existing central islands along George Street and Kendal Street would be removed to provide enough road width for traffic and new cycle lanes.
- Raised tables (where the carriageway and the footway are the same height) added along the route to create safer and accessible pedestrian crossings and reduce speed.
- Single yellow lines replaced by double yellow lines along George Street stepped cycle track to provide enough road width for traffic lanes and stop the cycle lanes being blocked by parked vehicles.
- Removal of some parking along the route to allow space for the cycle route. Where possible, alternative parking has been proposed. Any disabled or dedicated permit bays will be relocated in liaison with the bay users.
Please see PDFs for consultation drawings. Please note these may be changed after TMO consultation results have been published via the Cabinet Member Report


Have your say
Westminster City Council and TFL held a consultation between 15th May to 25th June 2023. We’ll use the responses to improve the proposals further before they are put before cabinet member at Westminster City Council. Subject to Traffic Management Order consultation and cabinet member approval, delivery of the route is hoped to start in 2024.
If you have any issues that aren’t related to this engagement (such as bins/parking offences), please inform us via Report It: https://www.westminster.gov.uk/report-it
Next Steps
Review the feedback received from the Cycleway 43 questionnaire (June 2023)
Submit updated proposals to cabinet member at both Westminster City Council (Winter 2023)
Subject to approval: hold a Traffic Management Order Consultation (Early 2024)
Subject to cabinet members’ approval: delivery commences (Mid 2024)
Frequently Asked Questions
Answers to the most common questions can be found below:
The proposed cycleway between Hyde Park and Marylebone includes advanced stop lines for cyclists (where people cycling can wait ahead of the traffic at traffic lights), new raised tables (a raised section across the road to reduce vehicle speed), stepped cycle tracks (a raised platform to create a physical separation between the cycle lane and general traffic). We are also proposing improved pedestrian crossing facilities and additional cycle parking facilities.
Discover more
Stay Informed
Follow our projects to get notified of upcoming engagements and the latest project related news.

