Home
Hubs
Community Survey Results
Stormwater
Education
2023 SPLOST
2017 SPLOST
Planning
Recreation
Infrastructure projects
Projects
Line Creek Nature Area Walkway Bridges
2024 Community Survey Results
Stormwater Rate Study
Slice of the City
Meade Field Girl's Softball - LED Field Lighting Upgrades
Peachtree City 101
2017 Project 39: Lake Peachtree Spillway Multi-Use Path Bridge
2017 Project 38: Lake Peachtree Dam/Spillway Upgrade
2017 Project 37: Restrooms- Line Creek Nature Area
2017 Project 36: Glenloch Pool Renovation & Splash Pad
2017 Project 35: Drake Field/All Children's Playground Bridge
2017 Project 34: Lake Peachtree Island Bridge
2017 Project 33: Police Dash Camera Replacement
2017 Project 32: Fire Ladder Replacement
2017 Project 31: Public Safety Radio Replacement
2017 Project 30: Fire Dept. SCBA Replacement
2017 Project 29: Ambulance Replacement
2017 Project 28: Path Tunnel Repairs (multiple)
2017 Project 27: Path Bridge repairs (multiple)
2017 Project 26: Path Resurfacing – Increased Paving
2017 Project 25: Path/Trail Connectivity- Matching Funds
2017 Project 24: New Path Connection – Crosstown Bridge/Tunnel Engineering
2017 Project 23: New Path Connection – Line Creek Nature Area
2017 Project 22: Replacement Bridge – HWY 54 at Lake Peachtree
2017 Project 21: New Path Connection – Kedron Village Retail Path Relocation
2017 Project 20: New Path Connection – Police Station
2017 Project 19: New Path Connection – Peachtree Parkway N (Lake Kedron)
2017 Project 18: New Path Connection – MacDuff Parkway
2017 Project 17: New Path Connection – Huddleston Road
2017 Project 16: New Path Connection – Paschall Road
2017 Project 15: New Path Connection – Crosstown Road (south side)
2017 Project 14: New Path Connection – Robinson Road (Whitfield Farms/Spear Road)
Short Term Rentals
2017 Project 13: New Path Connection – Crosstown Road (north side and crossing)
2017 Project 12: New Path Connection - Peachtree Parkway N: Flat Creek Road to Interlochen
2017 Project 11: New Path Connection – Flat Creek Nature Area (Crosstown to PAC)
2023 Project 38 - New Pickelball Courts with Lights and Restrooms
2023 Project 37 - Playground Equipment Replacement & Expansion - Citywide
2023 Project 36 - Community Garden Site Redevelopment - 110 Kelly Dr
2023 Project 35 - Drake Field Restrooms
2023 Project 34 - Intersection Improvements at Peachtree Pkwy & Robinson Rd
2023 Project 33 - Replace Street Sweeper
2023 Project 32 - New Village Signage
2023 Project 31 - Street Resurfacing Program - Citywide
2023 Project 30 - Grade Separated Crossing to Connect Booth Middle and McIntosh High
2023 Project 29 - Path Tunnel & Bridge Maintenance - City Wide
2023 Project 28 - Safety & Traffic Flow Improvements for Corrugated Metal Path Tunnels
2023 Project 27 - Robotic Slope Mower
2023 Project 26 - Replace Skid Steer
2023 Project 25 - Replace 750 Dump Truck
2023 Project 24 - Replace Asphalt Spreader
2023 Project 23 - Path Transition Reconstruction - City Wide
2023 Project 22 - Path Construction - Citywide
2023 Project 21 - Portable Vehicle Lift
2023 Project 20 - UAV (Unmanned Aerial Vehicle) Replacement
2023 Project 19 - K-9 Additions and Replacements
2023 Project 18 - SRT Vehicle
2023 Project 17 - Digital Radios Replacement & Expansion
2023 SPLOST 16 - Real-Time Crime Workstation
2023 Project 15 - Pop-up Security Trailer & Tower
2023 Project 14 - Evidence Storage Enhancements
2023 Project 13 - Pole Barn
2023 Project 12 - Transport Vehicle
2023 Project 11 - Station 82 Construction - Eastside
2023 Project 10 - Station 85 Construction - Southside
2023 Project 9 - Digital Radios Replacement & Expansion
2023 Project 8 - Extrication Rams for Engines
2023 Project 7 - Long Term EMS Equipment
2023 Project 6 - Turnout Gear Washer & Dryer
2023 Project 5 - Replace Station 84 Generator
2023 Project 4 - Replace Quint 84
2017 Project 10: New Path Connection – Peachtree Parkway N @ North Hill
2017 Project 9: New Bridge & Path Connection – Hwy 54 W at MacDuff Pkwy
2017 Project 8: New Path Connection – Peachtree East Shopping Center
2017 Project 7: HWY 54 / HWY 74 Additional Projects – Matching Funds
2017 Project 6: Highway 74 at N. Kedron Drive- Left Turn Lane
2017 Project 5: HWY 54 at MacDuff Pkwy
2017 Project 4: HWY 54 at Planterra Way
2023 Project 3 - Replace Two Reserve Medic Ambulances
2023 Project 2- Purchase New Engine - Station 85
2023 Project 1 - Replace Two Reserve Engines
2017 Project 3 - Intersection – Crosstown/Peachtree Parkway
2017 Project 2 - Street Seal Coating
2017 Project 1 - Increased Street Paving
2017 SPLOST Information
2023 SPLOST Information
Path System Navigation App
Flat Creek Boardwalk Repairs
Parks and Recreation Master Plan
Updates
Short Term Rental Public Opinion Survey Results Available
Dam / Spillway Enhancements Projects
Parks and Recreation Projects
Public Safety Projects
Multi-Use Path System Projects
The Flat Creek Nature Area Boardwalk is Open!
Recreation Master Plan Survey Open 12/1/2023
Tier 2
Recreation Projects
Roads Projects
Paths Projects
Public Safety - Police
Roads Projects
Public Safety - Fire
Steering Committee appointed by City Council