3rd Street North (BR-25-H1)
BR-25-H1 - This project will upgrade water and sewer along with full right-of-way street reconstruction.
45th St S Concrete Paving Rehab (PR-24-A1)
PR-24-A1 - Fresh pavement, better sidewalks and trails, and smoother turns at 23rd Ave S — exciting upgrades are coming soon!
9th Ave S, 6th St S & 7th St S Reconstruction (BR-25-B3)
BR-25-B3 - Exciting improvements are coming! This project includes roadway reconstruction, water and sewer updates, storm sewer installation, sidewalk replacement, and new asphalt.
Sanitary Sewer Lining (UR-24-F1)
UR-24-F1 - Revitalizing the sanitary sewer system from 20th Ave N to 25th Ave N! Upgrades include sewer lining, manhole repairs, and spot fixes—boosting reliability and keeping things flowing smoothly for the community!
8th Street North (BR-25-G1)
BR-25-G1 - Big changes on 8th St! N 🚧 Full road rebuild with new water, sewer, storm drains, pavement & lighting—boosting Fargo’s infrastructure!
Asphalt Wear Course Project (PN-25-A1)
PN-25-A1 - Smooth streets ahead! 🚧 We're laying the final asphalt layer to enhance ride quality, drainage, and fix pavement issues. Expect some lane closures, reduced parking, and temporary sidewalk closures. Thanks for your patience!
Concrete Rehab - University Drive North (PR-25-F1)
PR-25-F1 - Big improvements coming to University Dr N! Concrete repairs, safer crossings, and upgraded intersections — expect traffic impacts during construction!
Concrete Spot Repairs City Wide (PR-25-A1)
PR-25-A1 - The proposed project will include concrete pavement repair and incidentals on streets in various areas in the City.
Seal Coat Project (PR-25-C1)
PR-25-C1 - Street improvements are on the way in several areas of the city! This year’s seal coat maintenance project will protect and extend the life of our roads, ensuring a smoother and safer drive for everyone.
Mill & Overlay Projects: 2025 (PR-25-E1 and PR-25-H1)
PR-25-E1 & PR-25-H1 - Get ready for smoother, safer, and better-looking roads! Our Mill & Overlay project is kicking off soon, bringing a fresh new surface to your neighborhood streets. Say goodbye to cracks and potholes!
Red River Shared Use Path - 15th Ave N to South Woodcrest Dr N (SN-25-B0)
Get ready for a scenic new path along the Red River! Connecting 15th Ave North to South Woodcrest Drive, it’s perfect for walking, jogging, and biking.
NP Ave. N (BR-25-F1)
BR-25-F1 - This project brings new water mains, sanitary and storm sewer upgrades, fresh pavement, sidewalks, and modern street lighting—all for a safer, better neighborhood! Stay tuned!
9th Street North (BR-25-A1)
BR-25-A1 - Major upgrades coming: new water & sewer lines, storm inlets, sidewalk & driveway fixes, and fresh asphalt paving. A smoother, safer road is on the way!
Hickory St N, Maple St N & 29th Ave NE Reconstruction (BR-25-E1)
BR-25-E1 - Big upgrades are coming! We're replacing water mains, sewer lines, and storm pipes, plus fresh pavement, sidewalks, and driveways.
Lilac Lane (BR-25-C1)
BR-25-C1 - We’re upgrading water mains, replacing service lines to curb stops, and making critical sewer repairs, including service replacements behind the curb. Stormwater drainage will also improve with realigned pipes, new inlets, and better flow.