Savannah Green Streets & Alleys Project

This project will repair and replace streets and alleys, fostering a safer and pleasing environment for residents.

What improvements will be made?

This effort will patch and reconstruct sections of deteriorated roads in the Savannah Green Subdivision. Along with improving the road conditions, the project will repair manholes, inlets, alley underdrains and enhance sidewalks for the benefit of all community members. The 2025 Phase of this project focuses primarily on Chippewa Street.

How long will this project take?

Road Closures on Chippewa will begin in June 2025. Weather pemitting, work should be complete by Sept. 1.

How will residents be impacted?

During this work, access to work areas will be limited. Residents are encouraged to take alternative routes around construction areas.

  • Garbage and recycling pickup remains from the alleys as usual. Some residents will need to place their garbage and recycling on the opposite side of the street. The Town will reach out to those residents directly.
  • Parking will not be allowed on Chippewa Street while work is being completed.
  • The Town of Normal coordinated with the United States Postal Service to identify residents whose mail delivery will be impacted due to the ongoing road closure. The June 13 update provides information about temporary mail solutions. Additionally, information will be posted on doors of impacted homes.

Why is this project needed?

Since its construction in the early 2000s, Savannah Green Subdivision has experienced worsening conditions on its streets and alleys due to premature and accelerated deterioration. This significant issue is attributed to both material and workmanship problems during the initial installation phase, compounded by high ground-water levels in this region.

How can residents stay informed?

  • Watch for informational fliers to be placed on the front door of impacted homes.
  • Stay informed of road and street closures by signing up for text notifications at Notify Normal.
  • Click the "Stay Informed" button below to receive overall project updates.
  • Monitor the NextDoor social media platform. Messages specific to this project will be shared via the Savannah Green neighborhood grouping within the app.

Stay Informed

Get notified on upcoming engagements and the latest project related news.

"We ask residents for their patience. We understand this effort will create inconveniences, but the end result will be worth it. We are committed to keeping you informed."
Ryan Otto
Ryan Otto
Director of Engineering & Public Works

Estimated Dates (Red Dot = completed work)

Hull and Bull Streets
April 1, 2024
Perry Lane
April 12, 2024
Abercorn
April 23

Project Updates

22 items

Updates to Mail Delivery and Traffic Patterns in Savannah Green

The Chippewa Street Improvements project is progressing to completion!

View Update

Montgomery Street Alley Entrance Closure

Beginning 7 a.m., Monday, August 25, there will be an alley entrance closure between Montgomery Street and River Landing Street for pavement repair.

View Update

June 13: Updated Solutions for Mail Delivery in Savannah Green

Temp Mailboxes to be installed

View Update

June 6, 2025: Impacted Mail Delivery in Savannah Green

Town coordinating with USPS

View Update

Mail delivery to resume Nov. 12

With construction complete, regular mail delivery will resume

View Update

Alley Opening Notice

Alleys are opening back up!

View Update

Alleys 39 and 29C to close Sept. 4

Alley 39 between Montgomery Street and Oglethorpe Avenue and Alley 29C between Perry Lane and Bull Street will close Sept. 4

View Update

Alleys to open in Savannah Green

Alleys with the first layer of asphalt placed will open Aug. 26 so residents can park in their garages

View Update

Alleys 32F & 32G Closing Aug. 28

Starting Aug. 28, alleys 32F between Perry Lane & Bull Street and 32G between Bull Street and Whitefield Street will be closed for reconstruction

View Update

Alley 33A Closure beginning Monday, Aug. 12

Beginning at 6 a.m., on Monday, August 12, Alley 33A will be partially closed for reconstruction.

View Update

Re-paving efforts expected to start Aug. 5

Whitefield Street, Alleys 41 and 29D will be first to be addressed

View Update

Alleys 41 & 29D Closure - Update

Alleys 41 and 29D in the Savannah Green subdivision continue to be closed

View Update

Whitefield Street to close June 19

Savannah Green Update: Whitefield Street between Shelbourne Drive and Bull Street

View Update

Alleys 40 & 32E to Close June 17

Savannah Green Update: Alleys 40 and 32 E (between Perry Lane and Drayton Street)

View Update

Alleys 31B, 31C and 31D To Close June 12

Savannah Green Update: Alleys 31B, 31C and 31D behind Oglethorpe Avenue (between Whitaker Street to Perry Lane)

View Update

Alleys 41 & 29D to Close June 3

Savannah Green Update: Alley 41 & 29D (between Bull Street and Perry Lane)

View Update

Teegan Street to close beginning May 20

Savannah Green Update: Teegan Street

View Update

Drayton Street to close beginning May 13

Savannah Green Update: Drayton Street

View Update

Whitaker Street to close beginning April 30

Savannah Green Update: Whitaker Street between Oglethorpe & Henry

View Update

Abercorn Street to Close April 23

Savannah Green Update: Abercorn between Oglethorpe and Henry

View Update

Perry Lane to close April 15

Savannah Green Update: Perry Lane between Montgomery & Henry

View Update

April 1 Marks Start of Work in Savannah Green

Bull and Hull Street Closure

View Update

Important Dates

4
Dec 2023

Normal Town Council Awards Bid to Stark Excavating

19
May 2025

Normal Town Council Awards Bid to Stark Excavating