City Construction Projects
Explore the latest construction projects happening across Denton.
Proyectos activos
Western Blvd (US 380 to Jim Christal Blvd)
Discover how Denton is working to improve mobility and more efficient commute.
Safe Routes to Schools and Sycamore Mixed-Use Path Pedestrian & Bike Improvements Project
In an effort to see savings through economies of scale, TxDOT authorized the city to combine all three grant funded pedestrian improvement projects into one singular project for bidding and construction purposes.
Milam Creek Gravity Sewer and Lift Station
The Milam Creek Project is one of the final stages of the I-35 corridor utility relocation efforts.
FM1515 (Airport Rd)
Water and Wastewater line relocation for TxDOT widening of Airport Road.
Downtown Area Railroad Quiet Zone
The Downtown Area Railroad Quiet Zone Project will construct the railroad required crossing improvements for vehicular, bicycle and pedestrian traffic allowing the implementation of a quiet zone through the downtown corridor.
Westgate Drive Improvement Project
The W. Westgate Drive Improvement Project will reconstruct the street to meet City of Denton residential standards.
Ryan Road Reconstruction Project
The Ryan Road Reconstruction Project will improve mobility and safety on Ryan Road from Teasley Lane (FM 2181) to Country Club Road (FM 1830)
Riney Road East Improvement Project
The purpose of this project is to widen Riney Rd to its full roadway width in coordination with the opening of a new DISD elementary school.
Pecan Creek 4 - Phase 3 & 4
Pecan Creek 4 Phases 3 & 4 include several improvements
Neighborhood 1B
The 2019 Bond Neighborhood 1B project is a part of a multi-phase street reconstruction project to rebuild existing streets that have reached the end of their useful life.
Mingo Ruddell Quiet Zone
Welcome to the MRQZ Project (Mingo Ruddell Quiet Zone) which was approved in the City of Denton’s 2023 Bond Program. MRQZ comprises four interconnected projects aimed at improving infrastructure and safety.
McKinney Sidewalks
Construct new and improve accessibility of sidewalk along South side of E. Mckinney Street to provide connectivity from Loop 288 to Audra Ln.
Linda McNatt - Animal Care & Adoption Center
The expansion project will improve the overall shelter environment and capacity to meet the growing community and animal needs.
Hickory Creek Road Phase 3
The Hickory Creek Road Phase 3 project is located on Hickory Creek Road from Riverpass Drive to FM-1830.
Parque de bomberos n.º 5 y n.º 6
Dos (2) nuevas estaciones de bomberos con una superficie aproximada de 12,500 a 14,500 pies cuadrados. Una (1) estación de bomberos, con cuatro (4) dársenas para aparatos, y otra (1) estación de bomberos, con tres (3) dársenas para aparatos con espacios habitables para diez personas, incluyendo dos (2) oficiales.
Elm and Locust Ph 2 Improvements
This project consists of full depth reconstruction of N Elm Street from W McKinney St to University Drive (US-380) and N Locust St from W McKinney St to University Drive (US-380).
Denton Solid Waste Fleet
The Denton Solid Waste Fleet Shop project will comprise 14,500 sf of single-story concrete tilt wall construction.
City Sidewalk Improvement Projects
The intent of this page is to provide the most up to date information on City sidewalk installation projects.
Bonnie Brae
To accommodate mobility needs, Bonnie Brae Street is being expanded from a two-lane undivided rural roadway to a four-lane divided urban street.
Water Works Improvement
A key objective of the Aquatics Master Plan is to improve Water Works Park by offering a broader array of amenities for families, friends, and individuals seeking recreational activities and leisure.
Neighborhood 2 & 6
The 2019 Bond Neighborhoods 2 & 6 project is a part of a multi-phase street reconstruction project to rebuild existing streets that have reached the end of their useful life.
Neighborhood 5B & Oakland Drainage
This project consists of full depth reconstruction of 17 street segments within the NBHD-5B project area and the upgrade of drainage system under Oakland Street (Pecan Creek) with the installation of a new detention pond.